Electrical Installations Guide
Loading...
Ω Fioproject guide
Saved on this device New project
FIRST, THE CONTEXT

Let's draw the map of your installation.

Tell us what kind of work you are planning. Fio adjusts the references and guides the rest.

01of 05
F
Hello, I am Fio.

I will turn your information into an organized preview. When I use a formula, I will show you how it works.

Project name
Type of work
Reference entry pattern
Number of floorsUse 1 for a single-story house.
Scope or observationsThe more context, the better the guidance. You can review everything later.
You don't need to know the perfect answer right now.Continue→
STEP 02 · SURVEY

What will consume energy?

Separate loads by circuit. One line for each usage group helps in choosing the right protection.

02of 05
i

Why separate? Lighting, outlets, and high-power equipment have different behaviors. This makes the project safer and easier to maintain.

Circuit description
Location / room
Floor
Load type
Equipment / reference
Estimated power (W)Check the equipment label or use an estimate.
Voltage (V)
Approximate length (m)Helps estimate voltage drop.
Tip: loads above 1,500 W usually deserve a dedicated circuit.+Add circuit

Project circuits

Review demand→
+

No circuits yet.

Start with the form above. Your first circuit could be the living room lighting.

STEP 03 · DEMAND

Not everything runs at the same time.

Demand is a realistic estimate of simultaneous use. See where each number comes from.

03of 05
Installed load0 Wsum of powers
Applied factor0%
Estimated demand0 Winstalled × factor
ƒ
Open calculation

The estimated demand reduces the sum to represent probable use.

Demanda = 0 W × 0,00 = 0 W

By circuit

estimated current
F
demand.guideTitle

BackSize protection→
STEP 04 · PRE-SIZING

Protection for every path.

The recommendations below are initial references, calculated based on the current of each circuit.

04of 05
✓
Reference based on NBR 5410

Final sizing also depends on installation method, temperature, grouping, and voltage drop.

DR

RCD 30 mA

Recommended for wet areas, outdoor outlets, and locations with a higher risk of shock.

recommended
DPS

SPD Class II

Helps limit surges coming from the grid. Must be coordinated with the grounding system.

consider
⏚

Grounding

Continuous protection conductor, organized busbar, and equipotential bonding according to the location.

validate in field
BackAssemble delivery→
STEP 05 · DELIVERY

Your project, ready to review.

Use this summary to talk to the electrician or responsible engineer.

05of 05
PROJECT VISUALIZATION

Electrical schematics to review

See how the panel distributes power to each registered circuit.

↗Print schematic▣Print report / PDF
Single-lineone line per circuit Multifilarphases and protection
power supplycircuitprotection

Schematic representation for study and review. It does not replace the executive diagram, protection coordination, or validation by a qualified professional.

Bill of materials

estimate

Summary memorial

for review
F
Want a second look?

The mentor can point out gaps in your survey using simple language.

✦Ask Fio for a review
Before executing

This report is an educational preview. Check the utility company's standards, site conditions, and validate everything with a legally qualified professional.

Back▣Copy summary