Let's draw the map of your installation.
Tell us what kind of work you are planning. Fio adjusts the references and guides the rest.
I will turn your information into an organized preview. When I use a formula, I will show you how it works.
What will consume energy?
Separate loads by circuit. One line for each usage group helps in choosing the right protection.
Why separate? Lighting, outlets, and high-power equipment have different behaviors. This makes the project safer and easier to maintain.
Project circuits
No circuits yet.
Start with the form above. Your first circuit could be the living room lighting.
Not everything runs at the same time.
Demand is a realistic estimate of simultaneous use. See where each number comes from.
The estimated demand reduces the sum to represent probable use.
Demanda = 0 W × 0,00 = 0 WBy circuit
estimated currentProtection for every path.
The recommendations below are initial references, calculated based on the current of each circuit.
Final sizing also depends on installation method, temperature, grouping, and voltage drop.
RCD 30 mA
Recommended for wet areas, outdoor outlets, and locations with a higher risk of shock.
SPD Class II
Helps limit surges coming from the grid. Must be coordinated with the grounding system.
Grounding
Continuous protection conductor, organized busbar, and equipotential bonding according to the location.
Your project, ready to review.
Use this summary to talk to the electrician or responsible engineer.
Electrical schematics to review
See how the panel distributes power to each registered circuit.
Schematic representation for study and review. It does not replace the executive diagram, protection coordination, or validation by a qualified professional.
Bill of materials
estimateSummary memorial
for reviewThe mentor can point out gaps in your survey using simple language.
This report is an educational preview. Check the utility company's standards, site conditions, and validate everything with a legally qualified professional.